Chat with us, powered by LiveChat
  • Fast Track

Documents required to obtain BVLOS approval for DJI DOCK (general approval + operating manual/OM + SORA)

0 people purchased the training
€3,000.00
Tax included
Available

We are authorised by DJI

Lifetime access to the e-learning platform. Always!

Discounts for our students

Free and closed access to the PFC | DJI Academy community

With the discount code NEWPFC STS training courses are 10% cheaper.

  • You receive the complete documentation (Operations Manual/OM, Application, Attachments) within max. 3 days after ordering!

  • The package also includes a ready-made SORA risk assessment.

  • You only add your company details.

  • Free consultation – support throughout the entire process.

  • General location (all of Germany).

  • Sparsely populated areas such as forests, fallow lands, large and small agricultural farms, as well as residential areas with very large plots (approx. 4 acres or 16,000 m²).

  • Pilot at any location in the world (internet connection).

  • Drones: M4D and M4DT.

  • The FTS requirement depends on your chosen location, but is included as standard in every set with DJI DOCK 3 (you only need a SIM card).

SHORT INFO:

Obtained Permit:

Individual LBA Operating Permit (BVLOS).

Complete documentation package (OM, SORA, Application) for DJI DOCK 3 – enables BVLOS flights (also remote) over sparsely populated areas (<50 pers./km²) throughout the entire federal territory.

Variants:

Standard package; extensions for airport environment, >120m AGL, controlled airspace, or higher population density available on request.

For whom?

  • Operators who plan flights at different locations or where these change frequently.
  • Object protection, monitoring, surveying, mapping, long-distance flights over areas with low population density (<50 people/km²).
  • Any operator intending to use the DJI DOCK 3 system outside the scope of standard scenario STS-02.

When do you need this?

  • If you want to conduct BVLOS flights without an additional airspace observer.
  • If you want to conduct flights remotely (pilot outside the operation site).
  • If you plan extensive, linear BVLOS flights.
  • If for any reason you do not meet the flight conditions in STS-02 or the Open category.

Partner & Location:

Pro Fly Center – Online processing.

Consultation: 1 Hour (Online).

Contact: info@proflycenter.com

DETAILS OF THE PRODUCT:

The documents prepared by us enable you to obtain approval from the LBA for BVLOS flights (beyond visual line of sight) over sparsely populated areas (<50 people per km²). The document was created so that it can be sent to the LBA almost immediately to obtain an individual operating permit for the entire federal territory! You decide where you want to fly!

The Operations Manual (OM) is the fundamental document for any drone operator wishing to conduct flights based on an individual operating permit from the LBA. The OM consists of various sections, each containing information important for the smooth planning and execution of drone operations. It is one of the documents reviewed by the LBA as part of the application process. A solid preparation testifies to the reliability of the operator and a professional approach to advanced drone flights for which the open category or standard scenarios (STS) are insufficient.

If the open category and the STS scenarios do not meet the requirements of your planned flights, you must apply to the LBA for an individual permit. This permit allows you to conduct flights according to your own needs, as required to achieve your goal. Using the Operations Manual and the SORA risk assessment, you describe the planned flight, determine its risk level, and demonstrate that you can limit and effectively manage it. The LBA evaluates your operation based on the submitted documents and – if everything goes successfully – grants an individual operating permit so that you can implement your project.

Appropriate documents such as the Operations Manual (OM), the SORA analysis, and the application must be prepared. If you buy our package, we prepare all documents for you. In addition, we meet beforehand for an individual appointment where we check everything carefully. Should a pre-application meeting with the LBA be required, we will support you. In most cases, however, a pre-application meeting with the LBA is not necessary. OM, SORA, and the application for the permit must be sent to the LBA. The waiting time for the decision is between 4 and 16 weeks.

  1. Order the service via our website.
  2. Pay for the order.
  3. In the payment confirmation, you will receive the complete documents and the contact details of our expert.
  4. Arrange a one-hour online consultation – our expert will show you what needs to be added and how to use the documentation.
  • Sparsely populated areas such as forests, fallow land, large and small farms, as well as residential areas with very large plots (approx. 4 acres or 16,000 m²).
  • Uncontrolled airspace Class G, at least 1.5 km away from uncontrolled airfields and landing sites.
  • Up to a height of 120 m AGL.
  • FTS (Flight Termination System) required if:
  • Adjacent areas within 1 km distance contain crowds of >40,000 people.
  • Adjacent areas (5 km) have an average population density of >50,000 people/km².

If our documentation does not meet your requirements, we can expand it to include another required scope. We have experience in obtaining permits for many different operations. FILL OUT THE FORM to receive a consultation and check the exact requirements with our experts.

  • Flights in areas with varying degrees of population density.
  • Flights in the airport environment.
  • Flights above 120 m AGL.
  • Flights in controlled airspace.
  • Flights requiring the use of additional equipment.

Cheaper as a set! Check it out!

Comments

Loading...